Novartis Campus - Krischanitz laboratory building

Fabrikstraße 16, Basel, Switzerland
Photo © Lukas Roth

The Pharmaceutical Group requested that its new building offers a highquality infrastructure for quotidian research activities yet providing for representative functions. The architect dissolved the paradigm by grouping all spaces around a central atrium. Above the splendid ground floor there are four more storeys with functional laboratories. The lighting designers were also confronted with these conflicting requirements. While the laboratories had to fulfil predominantly technical needs and thus followed standard stipulations the public spaces on the ground floor were to appear exquisite, sumptuous. The interface between the two worlds is the atrium, which is adequately dealt as “art for architecture”.

Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Photo © Lukas Roth
Lighting Designers
LICHT KUNST LICHT
Year
2008
Project Status
Built
Client
Novartis Pharma AG
Team
Edwin Smida
Architects
Architekt Krischanitz, Vienna

Related Projects 

  • Moos
    playze
  • Reiters Reserve Premium Suites
    BEHF Architects
  • Erweiterung und Instandsetzung Hallenbad Altstetten
    MIYO Visualisierung
  • Neubau von fünf Einfamilienhäusern
    Bäumlin + John Architekten ETH/SIA
  • The Forge at 105 Sumner Street in London
    Kiefer Klimatechnik GmbH

Magazine 

Other Projects by LICHT KUNST LICHT 

Sayner Hütte Foundry
Bendorf, Germany
Bike Square Novartis Campus
Basel, Switzerland
The State Parliament of Baden-Wuerttemberg
Stuttgart, Germany
German Ivory Museum
Erbach, Germany
Vocational College of the Archbishopric Cologne
Cologne, Germany