Olympic Stadium

Kiev, Ukraine
Photo © Marcus Bredt
Photo © Marcus Bredt
Photo © Marcus Bredt
Photo © Marcus Bredt
Photo © Marcus Bredt
Photo © Marcus Bredt
Photo © Marcus Bredt
Visualization © gmp Architekten
Drawing © gmp Architekten
Architects
gmp · von Gerkan, Marg and Partners Architects
Location
Kiev, Ukraine
Year
2011

On the occasion of the UEFA European Football Championships in 2012, which Ukraine is staging jointly with Poland, the rebuilding of the Olympic Stadium for the final game has been realized.

The new design for the reconstruction of the stadium respects the historic fabric with its important filigree prestressed concrete upper tier built in 1968, the frame of the new roof structure being detached and placed clear of the existing bowl. This most distinctive feature is therefore being encased in a new filigree glass façade and will be duly illuminated with appropriate lighting. The plinth structure of 1948 arising from the location of the stadium on a slope at the West End also was rebuilt in a different guise during reconstruction. The geometry of the lower part of the stand was completely redesigned and updated in accordance with safety requirements. Particularly at the west end of the stadium, beneath the main stand, extensive premises were constructed for players, VIP guests and press representatives. After the conclusion of the European Football Championships in 2012, an athletics track will be inserted, enhancing the functionality of the stadium. When the glazed structure of the stadium is illuminated at night, it is an urban landmark in the cityscape of downtown Kiev. The interior of the stadium, with seats for around 68,000 people, gains an individual, unmistakable identity with a membrane roof structure incorporating air supports and domes of light.
The new stadium was inaugurated on 8th October 2011, the first international match after the opening was held between Ukraine and Germany on 11th November 2011.

Competition
2008

Design
Volkwin Marg with Christian Hoffmann and Marek Nowak

Project leaders
Martin Bleckmann, Roman Hepp

Co-operation
gmp Architekten
with Private Creative Architectural Bureau Y. Serjogin LLC, Kiev

Structural design, roof and façade
schlaich bergermann und partner, Stuttgart – Knut Göppert with Markus Balz and Thomas Moschner

Structural design, concrete and masonry works
KKIG Aachen, Kempen Krause Ingenieurgesellschaft bR

General contractors
Kyivmiskbud, Kiev; AK Engineering, Kiev; Master Profi Ukraine, Dnepropetrovsk

Technical equipment
b.i.g. Bechtold Ingenieurgesellschaft mbH, Karlsruhe

Lighting design
Conceptlicht, Traunreut

Wayfinding system
formkombinat, Nina Marg, Hamburg Client National Sport Complex ”Olimpiyskiy”, Ukraine

Roof surface area
43,000 m2

Seats
68,000

VIP seats
2,300

Construction period
2008–2011

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by gmp · Architekten von Gerkan, Marg und Partner

Estádio Mineirão
Belo Horizonte , Brazil
Guna Villa
Jumrala, Latvia
Hanoi Museum
Hanoi, Vietnam
Data Center of China Life Insurance
Shanghai, China
School extension and replacement building for Gyula Trebitsch school
Hamburg, Germany