Dai-ichi Life Hibiya First Workers' Gate Renewal
Chiyoda Ward, Tokyo, 日本
DN Tower 21" completed in 1995 was renamed "Dai-ichi Seimei Hibiya First" in 2022. The entire building was renovated based on the concept of "realizing wellbeing through connections and bonds. We sincerely hope that the renewal of the building (including a through passageway that stimulates and leads the five senses) and the interior design clad in the spirit of tradition will work on the consciousness and sensitivity of the office workers and satisfy them both physically and mentally.
Selected for the Interior Planning Award 2023
- Interior Designers
- Field Four Design Office
- 年份
- 2023
- 项目状态
- 已建造
相关项目
杂志
-
每周建筑
The Three-Body Problem: Trapped in a Wave Sandwich
Eduard Kögel, Scenic Architecture Office | 13.04.2026 -
-









