Dai-ichi Life Hibiya First Workers' Gate Renewal

Chiyoda Ward, Tokyo, Japan
Photo © SS Tokyo Co Ltd / Shimao nozomu

DN Tower 21" completed in 1995 was renamed "Dai-ichi Seimei Hibiya First" in 2022. The entire building was renovated based on the concept of "realizing wellbeing through connections and bonds. We sincerely hope that the renewal of the building (including a through passageway that stimulates and leads the five senses) and the interior design clad in the spirit of tradition will work on the consciousness and sensitivity of the office workers and satisfy them both physically and mentally.

Selected for the Interior Planning Award 2023

Photo © SS Tokyo Co Ltd / Shimao nozomu
Photo © SS Tokyo Co Ltd / Shimao nozomu
Photo © SS Tokyo Co Ltd / Shimao nozomu
Photo © SS Tokyo Co Ltd / Shimao nozomu
Interior Designers
Field Four Design Office
Ano
2023
Status do projeto
Built

Projetos relacionados 

  • Moos
    playze
  • Reiters Reserve Premium Suiten
    BEHF Architects
  • Erweiterung und Instandsetzung Hallenbad Altstetten
    MIYO Visualisierung
  • Neubau von fünf Einfamilienhäusern
    Bäumlin+John AG
  • The Forge in der 105 Sumner Street in London
    Kiefer Klimatechnik GmbH

Revista 

Outros projetos por Field Four Design Office 

Nara Kasuga Hotel
Nara prefecture (Kinki area), Japan
Grande Maison Josui Garden City Central Forest II Guest House
Fukuoka prefecture (Kyushu), Japan
Grande Maison Josui Garden City Central Forest II
Fukuoka prefecture (Kyushu), Japan
Gotanda Alley
Japan
Field Four Design Office
Tokyo, Japan