TTR Reutlingen Office and Laboratory Building – 5th Construction Phase

Reutlingen, Germany
Photo © Thomas Herrmann

The new office and laboratory building of TTR GmbH, together with the fourth construction phase that we implemented between 2013 and 2014, defines the future centre of the technology park in Reutlingen. Due to its special location and the optional gastronomic use on the ground floor facing the square, the H-shaped floor plan typology, which is considered ideal for the business incubators, was slightly modified and further developed in the area of the central entrance core. As a result, the new building deliberately deviates from the otherwise highly symmetric existing buildings. The U-shaped structure allows for the division into flexible rental units that are accessed via the central core. On the two upper levels, it is possible to create self-contained rental areas facing east, south and west. The basement level provides parking spaces with direct access to the foyer.

Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Photo © Thomas Herrmann
Architects
a+r Architekten
Year
2017
Client
TTR GmbH

Related Projects 

  • Homag Campus Schopfloch
    blocher partners
  • Penthouse FR
    MR Design Studio | Product and Interior design
  • Rodari Primary School
    C+S Architects
  • Rosenberghalde
    freiraumarchitektur gmbh | Luzern
  • Fusion
    SNOW ARCHITEKTUR

Magazine 

Other Projects by a+r Architekten 

Bavarian NMR Center Garching
München, Germany
Rosenstein Quarter
Stuttgart, Germany
Büro- und Verwaltungsgebäude Mengen
Mengen, Germany
Factory Hall Pflug
Tübingen-Gomaringen, Germany
St. Johannes Maria Vianney Neighbourhood Development
Suttgart, Germany