Sports Centre Leonberg

Leonberg, Germany
Photo © David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
© David Matthiessen
© David Matthiessen
© David Matthiessen
© David Matthiessen
© David Matthiessen
© David Matthiessen
© David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
Photo © David Matthiessen
Ground floor
Drawing © 4a
Architects
4a Architekten
Location
Steinstraße 18, 71229 Leonberg, Germany
Year
2016
Client
Stadt Leonberg
Construction management
4a Baumanagement GmbH
Construction period
12/2012 until 01/2014 and 04/2015 until 08/2016
Gross floor area
approx. 11110 m²
Gross cubic volume
approx. 54525 m³
Service phases
1 to 9
Project team
Nikola Bothschafter, Swantje Hanussek, Jelena Koneva
Project management
Martina Henke, Christian Voermann
Awards
Pool Vision Award 2016, 1st prize "renovated pools" Wood Wool Award 2015

Redevelopment of swimming pool with sport halls and sauna.

The aim of the redevelopment was to increase the appeal and feel-good factor of the baths and sports halls and to update the technical features of the building, which was built in the 1970s. The redevelopment has been divided into two construction phases. In the first phase, the two sports halls and the bathing hall with adjoining rooms and technical installations were refurbished while the outdoor facilities were partly remodelled. The second phase involves the restructuring and complete redevelopment of the sauna area, comprising a sauna with a view and a sauna garden. To optimise energy efficiency, all the glass façades in the building have been replaced – the external appearance of the sports centre therefore remains virtually unchanged. The aim here was to optimise the sports centre with regard to its functional requirements and atmospheric effect using minimal structural measures. In order to achieve this, new floor plans were drawn up and the layout of routes in the foyer and adjoining rooms was optimised. The contemporary material and colour design lends the interior an identity of its own and ensures that the whole building gives a pleasant sense of space. The entire building technology has also been updated – only parts of the bathing water equipment have been retained.

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by 4a Architekten

Emser Thermal Baths
Bad Ems, Germany
Evangelical Grammar School Bad Marienberg
Bad Marienberg, Germany
Wilhelm-Maybach-School
Stuttgart, Germany
Wasserwelt Langenhagen
Langenhagen, Germany
Therme Lindau
Lindau, Germany