Amstetten School Campus

Amstetten, Oostenrijk
Architecten
Atelier Thomas Pucher
Jaar
2014

Campus for Secondary and Musical School in Amstetten, Austria. International competition, 1st prize


The construction of the Amstetten School by ATELIER THOMAS PUCHER is due to start in February. The project was the first prize of an international competition in mid-2009 and it is now ready to start the construction phase.

The main requirement of the competition was to combine two existing secondary schools in one location and complementing the program with a new music school and an additional gym. The surrounding area of the school is characterized by an extreme heterogeneous development, with a wide range of buildings with various functions and styles.

The design comprise a compact five-storey cube which rises in the surroundings as a distinctive landmark, combined with two lower volumes and three courtyards, within a chessboard formation. This strong formal design acts as a stable crown in the urban sprawl, the main characteristic of the surroundings. The main concept behind the formal design is the creation of a variety of spaces that can clearly organize the functions of the building. The external facades are cladded with perforated metal panels that act as sunscreen and provide both an image of continuity to the outside viewer, and a subtle sense of intimacy in the interior spaces. The courtyards are both physical and visual connections between the different volumes and perfect meeting places for the pupils during the recreational breaks. Each courtyard has a distinct identity, regarding its solar orientation and landscape design. As for the main cube – “the cube of education” - the program is distributed on the five floors around a central atrium. Acting as the main spine, scissor stairs grant direct access to all parts of the buildings.

Amstetten is one of the first schools to be registered as a green Climate:Active building in Austria, which is the equivalent of the LEED qualification (Leadership in Energy and Environmental Design). The construction is due to start in the beginning of February 2012 and it is expected to be completed in June 2014.



Structural Engineering

PETER MANDL structural engineers

Graz, Austria

Mechanical Engineering

KCE KÜHN Consulting Engineering GmbH

Wels, Austria

Building Physics

Dipl.Ing.Dr.techn. Roland Müller

Stockerau, Austria

Costs and Construction Management

GOBLI BAUENGINEERING

Graz, Austria

Fire Protection Plan

JOHANNES POTSCHKA

Hollabrunn, Austria

Client

Amstettner Schulinfrastrukturentwicklungs GmbH & CoKG

Amstetten, Austria

Area

GFA: 11 150 m2 Budget: €16 500 000

Status

2009 – 2014 (expected completion)

Gerelateerde projecten

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Andere projecten van Atelier Thomas Pucher

Welcome Tower
Graz, Oostenrijk
Viertel Zwei Plus
Vienna, Oostenrijk
Wimmer Medien Business Centre and Urban Development
Linz, Oostenrijk
Salzburg Regional Hospital extension - SALK
Salzburg, Oostenrijk
Villa SK
Graz, Oostenrijk