Iberia Centre for Contemporary Art

Project description:

This project is located at 798 art district, Beijing. It is a redevelopment project converting a group of industrial buildings to an integrate art centre.

Project Name: Iberia Centre for Contemporary Art

Location: Beijing

Client: Iberia Centre for Contemporary Art

Architect: Liang Jingyu

Project Team: Peng Xiaohu, Yang Jieqing, Li HongleiZhou Yuan

Structure and Material: Steel Structure with some brick bearing structure

Building Area: 3000 sq.m.

Cost: 9 million RMB

Design Period: August 2007 to May 2008

Construction Period: September 2007 to July 2008

Architetti
Approach Architecture Studio
Anno
2008
Stato del progetto
Costruito

Progetti collegati 

  • Moos
    playze
  • Reiters Reserve Premium Suiten
    BEHF Architects
  • Erweiterung und Instandsetzung Hallenbad Altstetten
    MIYO Visualisierung
  • Neubau von fünf Einfamilienhäusern
    Bäumlin+John AG
  • The Forge in der 105 Sumner Street in London
    Kiefer Klimatechnik GmbH

Rivista 

Altri progetti di Approach Architecture Studio 

Localand Foods
Da Nan Po, China
Village Center Redevelopment in Dananpo
Dananpo, China
Students’ Lounge at Eurasia University
Shaanxi, China
ARRTCO Beijing
Beijing, China
Chaoyang1919 Film Studio
Beijing, China