Humanwell Group Headquarter

The form of the project responds to the immediate context, the site boundaries and program requirements.  The higher and lower wings accommodate offices and labs respectively.  The massing of both buildings is articulated at different levels with setbacks and cantilevers to and from the façade surfaces.  They provide a lively interface with the plaza and road.  A 750mm module is used in both plan and façade, which is the standard module of the furniture, stone and aluminum panels.

Status: Completed

Client: Wuhan Bio-lake Commission

Building Area: 150,000 sq.m.

Partner-in-Charge: Zhao Zhonggui

Project Team: Zhao Zhonggui, Zhong Mingzheng, Wang Yuyang

Design Period: 2009

Construction Period: 2010-2011

Architetti
Zephyr Architects
Anno
2011
Project Status
Costruito

Progetti collegati 

  • Gymnasium Schulstraße
    Kronaus Mitterer Architekten
  • GROHE Water Experience Center
    D’art Design Gruppe GmbH
  • Limmatquai 4
    Kästli Storen
  • Volksschule Erlaaer Schleife
    Kronaus Mitterer Architekten
  • Ortsdurchfahrt Domat/Ems
    Luminum GmbH

Rivista 

Altri progetti di Zephyr Architects 

New Energy Campus Reception Center
Wuhan, China
Bio-Lake Offices
Wuhan, China
Donghu Civic Center
Wuhan, China
Wuyuan Hotel and Resorts
Jiangxi, China
Bio-Lake Reception Center
Wuhan, China