Modular Zug

Photo © Jürg Zimmermann

Four school locations in the city of Zug needed supplementary premises for care and leisure facilities, as well as classrooms. The column-free module measures 3.00 x 9.41 m and several floor plan options can be combined. The modules can be dismantled and assembled in another site with a different typological configuration. The module is connected to sanitary installations and adjacent premises by a central entrance. The upper floor is accessed through an external staircase. Buildings are certified to Minergie standards.

Photo © Jürg Zimmermann
Photo © Jürg Zimmermann
Photo © Jürg Zimmermann
Architects
Bauart Architekten und Planer
Year
2013
Project Status
Built
Client
Stadt Zug

Related Projects 

  • Secondary School Schulstraße
    Kronaus Mitterer Architekten
  • GROHE Water Experience Center
    D’art Design Gruppe GmbH
  • Limmatquai 4
    Kästli Storen
  • Primary School Erlaaer Schleife
    Kronaus Mitterer Architekten
  • Ortsdurchfahrt Domat/Ems
    Luminum GmbH

Magazine 

Other Projects by Bauart Architekten und Planer AG 

Campus Arc 2 Neuchâtel
Neuchâtel, Switzerland
Swiss Federal Statistical Office Tower Neuchâtel
Neuchâtel, Switzerland
Ecoparc neighborhood Neuchâtel
Neuchâtel, Switzerland
Marin Centre La Tène
La Tène, Switzerland
Manufacture Fehr + Cie SA and Technofrap SA La Chaux-de-Fonds
La Chaux-de-Fonds, Switzerland