Chaoyang1919 Film Studio

Beijing, China
Photo © Approach Architecture Studio
Photo © Approach Architecture Studio
Photo © Approach Architecture Studio
Photo © Approach Architecture Studio
Photo © Approach Architecture Studio
Photo © Approach Architecture Studio
Architects
Approach Architecture Studio
Location
Beijing, China
Year
2010

The Chaoyang 1919 Film Studio is situated on one side of a tree-lined boulevard. To avoid a sense of overpowering scale on the environment, the building facade primarily features concrete blocks while maintaining a humble and transparent effect. The building design emphasizes the proportion and scale of the building volume and its harmonization with the surrounding environment. The interior space of the building is flexible and versatile, providing photographers with diverse shooting scenarios and lighting settings. The overall building design reflects a high degree of attention and control over the environment, proportion, scale, and functionality.

Related Projects

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressive cleanroom expansion
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

Other Projects by Approach Architecture Studio

Approach Architecture Studio Office Design
Beijing, China
Iberia Centre for Contemporary Art
Beijing, China
Yangmeizhuxiejie Street
Beijing, China
Dashilar Urban Revitalization
Beijing, China
Wuyong Useless Space
Beijing, China