Airbus Immenstaad

Germany
East Facade
Photo © RSE+ / Foto Markus Guhl

In the area of the existing factory premises in Immenstaad on Lake Constance, a hall extension was built for satellite integration. A clean room production hall in ISO 8 and ISO 5 for the assembly of the satellites was built on an area of approx. 4.200 sqm. The clean room volume of the two ISO 5/8 rooms, which are not separated from each other, amounts to 4.500 sqm and is supplied via a 3-sided supply / exhaust air (ceiling, side wall, floor).

Cleanroom hal ISO 8 und ISO 5
Photo © RSE+ / Foto Markus Guhl
Cleanroom hal ISO 8 und ISO 5
Photo © RSE+ / Foto Markus Guhl
Staircase
Photo © RSE+ /Foto Markus Guhl
Technics Plenum Chamber above the cleanroom hal
Photo © RSE+ / Foto Markus Guhl
South-West Facade
Photo © RSE+ /Foto Markus Guhl
Architects
RSE+ Architekten Ingenieure GmbH
Year
2018
Project Status
Built
Client
Airbus Defence and Space Immenstaad

Related Projects 

  • Mensa Berufsschule Ziegelbrücke
    Soliman Zurkirchen Architekten
  • Moos
    playze
  • Reiters Reserve Premium Suites
    BEHF Architects
  • Erweiterung und Instandsetzung Hallenbad Altstetten
    MIYO Visualisierung
  • The Forge at 105 Sumner Street in London
    Kiefer Klimatechnik GmbH

Magazine