Low Energy MZ House

Barcelona, Spanien
Foto © Pol Viladoms
Foto © Pol Viladoms
Foto © Rodrigo Díaz
Foto © Rodrigo Díaz
Foto © Rodrigo Díaz
Architekten
Calderon-Folch Studio
Standort
08003 Barcelona, Spanien
Jahr
2012

Enjoy a centenary house with the maximum comfort and minimum energy cost.

The challenge was to refurbish a house built in 1918 maintaining both the original volume and façade whilst improving the thermal and acoustic comfort. The construction systems and materials used have made possible not only to achieve the goal but also to lower the energy demand from 171 kWh/m2a to 17 kWh/m2a (known as a 10 factor rehabilitation); transforming a traditional  existing building into a Passive House in only 120 days.

The three main difficulties were: the north-east orientation of the row house, the limited budget and the urgency of the clients to move in.

The main operation was to redesign the section in order to re-orientate the house. The new skylight permits the solar passive gain in winter, the cross natural ventilation in summer, fills the centre of the house with natural light and provides a proper orientation to the solar panels. A new big opening stretches the tiny interior towards the garden.

A prefabricated dry construction system was chosen to achieve the maximum precision and shorten the building process. The different elements (roof, façade, mezzanine, staircase, skylight) were designed like Meccano pieces to be manufactured with a numerical control system and afterwards assembled in site. The whole roof was mounted in few hours, the same as the other elements.

In addition to such excellent energetic performance, bio-construction materials were used in order to reduce the environmental impact. Therefore, the new roof and façade were built out of a structural wood-frame construction system using OSB panels and natural sheep wool and wood-fibre boards for insulation. The ventilated façade is finished with planks of natural larch wood and the roof with heat-treated pine wood. In the interior, the mezzanine, kitchen and cupboards are entirely made of 3 Ply Shuttering panels and linoleum for the flooring. The house is provided with solar panels for water heating and a high energy efficient device for ventilation.

Dazugehörige Projekte

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazin

Andere Projekte von Calderon-Folch Studio

Open Pavilion
Barcelona, Spanien
El Roure Community Centre and La Ginesta Library
Begues, Spanien
Pedestrian Bridge
Manresa, Spanien
21 Public Housing Units
Sant Llorenç Savall, Spanien
Centre Léonce Georges
Chauffailles, Frankreich